G5-1_HCC_023 Gosport-Fareham BRT route improvements
Who
| Buyer | Hampshire |
| Supplier | Rocon Contractors Ltd |
What
A call-off from Lot 1 of the Generation 5 Civil Engineering, Highways & Transportation Collaborative Framework 2024 - 2028 (award notice published 01 February 2024). Installation of 2 No. uncontrolled pedestrian crossings including: • Removal of existing kerbs and installation of dropped kerbs with tactile paving • Localised removal of existing footway/carriageway and resurfacing of levels to suit dropped crossing points. • At the northern crossing only, 50m2 of carriageway resurfacing to provide a smooth crossing surface for pedestrians where the existing carriageway surface is in poor condition. • Minor re-application of road markings (like for like replacement of existing).
Dates and source
| Runs | 6 Jan 2025 to 24 Jan 2025 |
| OCID | ocds-b5fd17-62286e0b-dc20-4762-b149-151a0f0a4456 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.