HMP Nottingham - Fire Safety Improvements (FSI) BPRN: 581/18/4783
Who
| Buyer | Ministry of Justice — not a council we hold |
| Supplier | Kier Construction Limited |
What
The project involves FSI Works at HMP Nottingham; replacement of the existing fire alarm systems using hard wired technology. Where integrated Simplex panels are replaced containing General Alarm and/or intruder alarm these systems will also be upgraded/replaced. To include the provision of dedicated individual/localised UPS to provide secondary power supplies to all existing landing area misting systems. A constructor has been appointed for the design and build of the project. This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract. It is expected that the total construction cost of the project will be £13,370,422.The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £903,854.
Dates and source
| Runs | 6 Feb 2025 to 6 Oct 2028 |
| OCID | ocds-b5fd17-62fb9fa1-54d2-4835-be05-55fa4ebc8d58 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.