Abingdon NCN5 Missing Link Active Travel Scheme
Who
| Buyer | Oxfordshire |
| Supplier | Phil Jones Associates Limited |
What
This brief is for preliminary design of the Abingdon: National Cycle Network Route 5 (NCN5) Missing Link - East St Helens Street scheme (walking and cycling scheme). The Abingdon National Cycling Network Route 5 Missing Link - East St Helens Street Active Travel Scheme is included in the approved Abingdon Local Cycling and Walking Infrastructure Plan (LCWIP), and it will help tie together the Oxford, Abingdon, and Didcot Local Cycling and Walking Infrastructure Plans, and create a safe walking/wheeling/cycling route for all people. The Abingdon Local Cycling and Walking Infrastructure Plan (February 2023) is a 10-year plan (2023 to 2033) to improve and increase cycling and walking in the town
Dates and source
| Runs | 24 Feb 2025 to 23 Jul 2025 |
| OCID | ocds-b5fd17-5d05ae7f-0889-4749-99c9-101b361a292b |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.