PCI_LotA_137 B567 Blashford Bridge Refurbishment / Replacement
Who
| Buyer | Hampshire |
| Supplier | WSP UK Limited |
What
A call-off from Lot A of the Place, Connectivity & Infrastructure Professional Services Framework 2022-2026 (Published 4 March 2022). Blashford Bridge carries the A338 between Ringwood and Fordingbridge over an EA main river. The bridge has suffered from spalling concrete to the soffit exposing corroded reinforcement. Repairs to this have failed and are difficult to carry out due to very low headroom. This commission is to provide a view on options for repair of the bridge, if at all possible or, more likely, options for replacement.
Dates and source
| Runs | 24 Mar 2025 to 18 Oct 2025 |
| OCID | ocds-b5fd17-70179719-2e27-4fab-a11e-a71a8443ad47 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.