Civic Signal GUEST
ROWS
API PATHS
Docs Sign in
Browsing as a guest. A free key raises the rate limit.

PSF4 - Lots 1B & 2B - A595 Grizebeck Improvement Scheme Stage 2 - NEC Supervisor

Contracts Finder notice active GET /api/v1/contracts/120843
£117,300
value
GBP
4 Apr 2025
awarded
1
suppliers named

Who

Buyer Westmorland and Furness
Supplier Aecom

What

The A595 Grizebeck Improvement Scheme is a proposed 1.4km single carriageway road between Chapels and Grizebeck on the A595. The A595 provides a critical link for Cumbria, offering the only direct link between Barrow and its major manufacturing and energy industries to the South, the major cluster of nuclear and manufacturing industries in West Cumbria and onwards to Carlisle in the North. A two-stage design and build contract was entered into between W&FC and Story Contracting Ltd. Stage 1 (design and related elements) is complete and a contract for the Stage 2 (construction) has been signed, with £23m of funding secured from the Department for Transport (DfT) to support delivery of the scheme. The Council wishes to appoint an NEC Supervisor for the remaining duration of Stage 2 of the Design and Build contract.

Dates and source

Runs 5 May 2025 to 3 Jul 2025
OCID ocds-b5fd17-c87bdd86-01b7-4073-b978-365db1fc2270
Notice Read it on Contracts Finder

Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.