Civic Signal GUEST
ROWS
API PATHS
Docs Sign in
Browsing as a guest. A free key raises the rate limit.

24101 Northern Industrial Link Road (NILR) Detailed Design (Further Competition under ESPO Framework 664_21. Lot 5)

Contracts Finder notice active GET /api/v1/contracts/124002
£265,539
value
GBP
14 Apr 2025
awarded
1
suppliers named

Who

Buyer Cambridgeshire
Supplier Stantec UK Ltd.

What

Northern Industrial Link Road (NILR) Detailed Design is one of five schemes in the Northen Industrial Link Road project (NILR). This scheme aims at re-routing traffic from the town centre by linking two adjoining traffic routes - Hundred Road and Longhill Road which are currently separated via a small strip of private land. The scheme will provide an integrated 1.9km traffic route by upgrading Hundred Road to a two-way carriageway and connecting it to the existing two-way carriageway on Longhill Road. The scheme will also provide a full-length cycle way across the route on Hundred Road. The junction of Longhill Road and Elm Road (B1101) will also be upgraded to a roundabout

Dates and source

Runs 28 Apr 2025 to 31 Mar 2026
OCID ocds-b5fd17-28284548-2c48-4154-930b-e3c8e14f4c61
Notice Read it on Contracts Finder

Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.