24101 Northern Industrial Link Road (NILR) Detailed Design (Further Competition under ESPO Framework 664_21. Lot 5)
Who
| Buyer | Cambridgeshire |
| Supplier | Stantec UK Ltd. |
What
Northern Industrial Link Road (NILR) Detailed Design is one of five schemes in the Northen Industrial Link Road project (NILR). This scheme aims at re-routing traffic from the town centre by linking two adjoining traffic routes - Hundred Road and Longhill Road which are currently separated via a small strip of private land. The scheme will provide an integrated 1.9km traffic route by upgrading Hundred Road to a two-way carriageway and connecting it to the existing two-way carriageway on Longhill Road. The scheme will also provide a full-length cycle way across the route on Hundred Road. The junction of Longhill Road and Elm Road (B1101) will also be upgraded to a roundabout
Dates and source
| Runs | 28 Apr 2025 to 31 Mar 2026 |
| OCID | ocds-b5fd17-28284548-2c48-4154-930b-e3c8e14f4c61 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.