Relocation of the Indoor Market via Pagabo Framework - Refit and Refurbishment framework, to Lot 3, covering values between £1m - £5m,
Who
| Buyer | Stevenage |
| Supplier | CONAMAR BUILDING SERVICES LIMITED |
What
Pre-Construction Services Agreement to provide a clear programme until the end of RIBA 4, undertake electric supply logging on the existing mains electric supply, Undertake point cloud survey of the ground floor areas, Undertake design of the, mechanical, electrical and public services design until RIBA 6, and architectural design from RIBA 4 to RIBA 6, Provide value engineering opportunities, Procure sub-contracting work via the provision of three quotations per sub-contractor, prepare detailed construction programme, Provide the full names of the Architect, Structural, Mechanical, Electrical and Public Services Engineer, PD for CDM and Fire Consultant, Obtain CCTV survey for the drainage system, Identify provisional sums, Break Down all Preliminaries.
Dates and source
| Runs | 17 Mar 2025 to 17 Jun 2025 |
| OCID | ocds-b5fd17-1bef3d93-b876-457f-af2e-aebe75d4a140 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.