Sancroft Care Home - Hot and Cold Water Services and Internal Fit Out
Who
| Buyer | Harrow |
| Supplier | Borras Construction |
What
a) Hot and Cold Water Services The works consist of replacing the existing Low Temperature Hot Water (LTHW) heating, Cold Water Down Service, Hot & Cold Water Services with new copper pipework soldered and fully insulated throughout using Kingspan ODP Foil Backed insulation as per the tender drawings. To be boxed-in at high & low level and decorated with valves labelled behind metallic access panels. c) Internal Fitout Complete refurbishment and refit of all wet rooms / bathrooms including new floor finishes, ceilings, redecoration of walls, sanitary ware as well as making good all areas affected by the pipework replacement works.
Dates and source
| Runs | 1 Mar 2024 to 31 Aug 2025 |
| OCID | ocds-b5fd17-2a516900-12b1-4414-a793-69a8bea84312 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.