PSF4 - Lot 2A - The Undertaking of Road Safety Studies and Road Safety Audits
Who
| Buyer | Westmorland and Furness |
| Supplier | Waterman Infrastructure & Environment Ltd |
What
To undertake Engineering Safety Studies (ESS) in response to multiple safety concerns of the public or partners, as brought to the attention of the local Cumbria Road Safety Partnership (CRSP) Group or triggered by collision criteria being reached. Studies, which look to find similarities between collisions that, have occurred at a single site or across a route, which would indicate that there may be a determinable problem with an aspect of the infrastructure, such as road markings or traffic signs. The study will identify and present initial options for remedial measures indicating First Year rate of Return and recommended scheme(s) within a Report.
Dates and source
| Runs | 19 Feb 2024 to 31 Mar 2024 |
| OCID | ocds-b5fd17-e34c6179-826c-48a5-b7f3-716ceadf14bb |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.