Allerton 4th and 5th Floor Asbestos Removal
Who
| Buyer | UNIVERSITY OF SALFORD(THE) — not a council we hold |
| Supplier | Ductclean UK Limited |
What
Reinstatement works shall consist of the supply and install Sahara Tegular tile on 24mm grid to all rooms and corridors, where possible existing shadow batten shall remain in situ and reused. The University will supply all light fittings and the appointed service provider shall have these wired and installed by their in house electricians. (Further guidance can be provided regarding wiring requirements once access to the ceiling voids can be accessible during the works). • Window for all the 4th floor works 3rd June -5th Aug 2024 • Window for all the 5th floor works 17th June - 12th Aug 2024 For full tender information and to express an interest please visit our InTend portal via https://in-tendhost.co.uk/salford/aspx/Home.
Dates and source
| Runs | 27 May 2024 to 31 Jul 2024 |
| OCID | ocds-b5fd17-5c49306c-3a54-4446-afb1-b894948dfcc9 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.