2321 A16/B1180 Pinchbeck Roundabout
£3,935,981
value
GBP
10 Apr 2024
awarded
1
suppliers named
Who
| Buyer | Lincolnshire |
| Supplier | Breheny Civil Engineering |
What
Currently the roundabout is 45m in diameter. The proposed works are to increase the size of the roundabout to 58m in diameter. This will involve the roundabout moving northwards into the adjacent field. The field is approximately 3-4m lower than the existing carriageway and the levels need to be built up. Compared to the size of the scheme a large proportion of earthworks is required. On top of earthworks there will be, resurfacing, bridge joints, kerbing, drainage, street lighting, signs and lining
Dates and source
| Runs | 13 May 2024 to 28 Feb 2025 |
| OCID | ocds-b5fd17-6f9168cf-42d5-4083-8fcf-1c334d37a72b |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.