Homes England - DaRTs - Technical Due Diligence - Upton Lodge .
Who
| Buyer | Homes England (the name adopted by the Homes and Communities Agency) — not a council we hold |
| Supplier | TETRA TECH LIMITED |
What
Following the completion of an internal gap analysis the Agency has appointed a professional services team from the multi disciplinary panel to provide an update / review of the following: - \r \r - Updated utilities appraisal, including commentary on current position regarding electrical capacity.\r \r - Updated ecological walkover survey - further works TBC following outcome of this. \r \r - Existing highways. \r o Adoption position review. \r o Road cores site investigation - factual and interpretative report. \r o Underground utilities survey. \r o CCTV survey of drainage, which we believe will need to be extended to include the \r strategic drainage infrastructure that is already in place such as the outfalls to culverts. \r \r - Due to the historic nature of the information, we would also like the respondents to include a fee for providing a review note which covers the key areas of the outline planning permission (i.e. FRA, drainage strategy, including an update on strategy considering the connections into the infrastructure to the south which has been constructed by Morris Homes (New Pond 4 culvert connection), transport & highways, utilities).
Dates and source
| Runs | 8 May 2024 to 30 Aug 2024 |
| OCID | ocds-b5fd17-b7d1438c-3a79-44f3-84c6-ca5dfc83a401 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.