Colville Estate Phase 2C - Thames Water Sewer - Drop-Shaft installation
£868,289
value
GBP
1 Apr 2024
awarded
1
suppliers named
Who
| Buyer | Hackney |
| Supplier | Kier Construction Limited |
What
The London Borough of Hackney are carrying out a large regeneration of the Colville Estate. This STA refers to Phase 2C, which includes the development of two residential blocks, a row of terraced houses, a community centre and an energy centre. There is a large Thames Water (TW) sewer running beneath a section of the Phase 2C site that must be adapted in preparation for these development works. This includes the installation of a new drop-shaft so that the sewer can be accessed for future maintenance by Thames Water.
Dates and source
| Runs | 8 Jul 2024 to 2 Dec 2024 |
| OCID | ocds-b5fd17-2aaba2ad-72b5-4665-8c1e-59af82784f47 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.