PCI_LotA-056 Manydown Cycle Route Footbridge
Who
| Buyer | Hampshire |
| Supplier | Stantec UK Ltd. |
What
A call-off from Lot A of the Place, Connectivity & Infrastructure Professional Services Framework 2022-2026 (Published 4 March 2022). Review existing asset records and undertake site visit(s) to confirm dimensions. Review the existing widening options report produced by Atkins and provide comments on the proposals leading to a recommendation to the Client and asset owner on the choice of widening design. Undertake preliminary design of agreed widening option. Sequencing of construction work shall be taken into account to minimise closures of both the footbridge and the carriageway beneath. Climate change and future maintenance shall also be considered. Produce and submit Approval in Principle (AIP) documentation in accordance with DMRB document CG 300
Dates and source
| Runs | 3 Apr 2023 to 6 Oct 2023 |
| OCID | ocds-b5fd17-d8b4eb46-66b7-47ee-af56-007e33262704 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.