PMP 24 Swinnow Primary School
Who
| Buyer | Leeds |
| Supplier | Jennings Roofing Ltd |
What
Works include the following: - Carefully remove and dispose existing slate tiled roof covering to R17 and R20, including timber battens and set reusable slates and ridge tiles aside for re-use. Remove and dispose of existing iron rainwater goods and fascia boards to R17 and R20. Carefully remove and clean existing lead work/flashings and coping stones, to be set aside for re-use. Install new breathable roofing membrane and timber battens across existing roof structure. Supply and install new Iron rainwater goods and timber fascia Boards. Recover R17 and R20 with new slate tiled roof covering and re-bed ridge tiles. Re -bed and re-lay coping stones.
Dates and source
| Runs | 22 Jul 2024 to 30 Aug 2024 |
| OCID | ocds-b5fd17-5250bb22-e4c8-45ea-b076-7c0011b54198 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.