620278- M1 J13-12 SB Safety Critical Resurfacing- Main Works
Who
| Buyer | National Highways — not a council we hold |
| Supplier | Tarmac Trading Ltd |
What
A total of 1.49 Lane Km of Pavement requires resurfacing. There have been 37 patches that have been identified exact locations and length has been listed in the MCI document. For plane and replace existing pavement 40mm depth - Surface course to be replaced with 40mm SHW clause #942 0/10 TSC "W" surface course PSV 65. - Surface course to be replaced with 40mm SHW clause #942 0/10 TSC "W" surface course PSV 65. - Binder course to be replaced with 60mm SHW clause 929 AC20 HDM BIN 40/60 Des "W" Binder. This works will be requiring the co-ordination of other ongoing schemes in the area and route corridor.
Dates and source
| Runs | 16 May 2024 to 6 Jun 2024 |
| OCID | ocds-b5fd17-657add95-5726-4966-8f6a-2850d043d53d |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.