A417 Missing Link - Material Testing Laboratory
Who
| Buyer | KIER TRANSPORTATION LIMITED — not a council we hold |
| Supplier | SOCOTEC UK Limited |
What
Purpose of Notice - The procurement of a Subcontractor for the Material Testing Laboratory works in connection with the A417 Missing Link at Air Balloon. Scheme Description - Under the National Highways Limited Regional Delivery Partnership (RDP), we are appointed as the Principal Contractor for the design and construction of a new dual carriageway at the A417 Missing Link at Air Balloon. The scheme would provide 3.4 miles (5.5km) of new, rural all-purpose dual carriageway for the A417. The new dual carriageway would connect the existing A417 Brockworth bypass with the existing dual carriageway A417 south of Cowley. Registering Interest - Interested parties are to register their interest through making contact via guy.hornsey@kier.co.uk.
Dates and source
| Runs | 12 Feb 2024 to 30 Nov 2027 |
| OCID | ocds-b5fd17-9d76d907-60bb-4fc8-a6c3-36e0f006cde6 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.