G5-1_HCC_019 Outer Winchester Flood Alleviation Scheme - Phase 2
£198,237
value
GBP
7 Aug 2024
awarded
1
suppliers named
Who
| Buyer | Hampshire |
| Supplier | B&M McHugh Ltd |
What
A call-off from Lot 1 of the Generation 5 Civil Engineering, Highways & Transportation Collaborative Framework 2024 - 2028 (awarded 16 January 2024). To provide a below ground drainage high level overflow for the surface water system through Littleton. The bulk of the work is on North Drive and Fyfield Way. Works involves installing a new drainage system (pipes, catchpits and manholes).
Dates and source
| Runs | 9 Sep 2024 to 29 Nov 2024 |
| OCID | ocds-b5fd17-253a87d6-1a1b-46fa-b322-97a3daa543b6 |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.