Civic Signal GUEST
ROWS
API PATHS
Docs Sign in
Browsing as a guest. A free key raises the rate limit.

HMP Chelmsford Gas Main Replacement BPRN 522/22/7902

Contracts Finder notice active GET /api/v1/contracts/67249
£6,272,827
value
GBP
9 May 2024
awarded
1
suppliers named

Who

Buyer Ministry of Justice — not a council we hold
Supplier Galliford Try Construction Ltd

What

The existing gas line is not suitable due to the numerous leaks which continue to occur over the past two years at the establishment. Additionally, unnecessary cost is expended to operate temporary boilers in place of the primary gas not functioning properly, and the establishment also needs to increase their supply of gas to account for the new line. These improvements will bring: Gas Main Replacement: -Total replacement of the existing gas line system within the built environment of the Establishment (i.e., site wide). -Increase the gas supply to the Establishment to prevent boiler lock out A constructor has been appointed for the design and build of the project. This is a two stage Design and Build Contract let under the PPC2000 (Amended 2013) Form of contract. The original estimated value of the contract was calculated by MOJ, and its Cost Consultants following desktop and non-intrusive surveys and was based on information reasonably known at the time and arrived at via a thorough and appropriate methodology. The first stage will involve the constructor providing Pre-construction surveys and design services at a cost of £428123.

Dates and source

Runs 9 May 2024 to 19 Mar 2026
OCID ocds-b5fd17-c5aecea8-c2fa-45ae-9bd4-9d89d19cbd28
Notice Read it on Contracts Finder

Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.