Civic Signal GUEST
ROWS
API PATHS
Docs Sign in
Browsing as a guest. A free key raises the rate limit.

CEFAS24-88 Contract for a QuantStudio 5 Real-Time PCR System

Contracts Finder notice active GET /api/v1/contracts/70322
£30,180
value
GBP
10 Sep 2024
awarded
1
suppliers named

Who

Buyer Cefas — not a council we hold
Supplier Life Technologies Ltd

What

Cefas have a requirement for a QuantStudio 5 real time PCR system for detection and quantification of DNA. Cefas currently use the QuantStudio 3 system and platform, with specific UKAS accredited methods used, and to ensure that results do not vary and adversely affect both statutory, and research and development delivery, the QuantStudio 5 system is required to ensure continued compliance and compatibility. Scope of Requirements: 1. Technical Requirement Cefas require one QuantStudio 5 real time PCR machine with the following specification: • 96-well thermal block, with block zones to test a minimum of 6 temperatures and 6 decoupled filters with up to 21 combinations for 96-well system • Excitation and detection range of 450-680 nm and 500-730 nm • Onboard memory of more than 9 GB • Communication interface by cloud based connect, USB, or Wi-Fi • Compatible with the currently used QuantStudio 3 system, to ensure Cefas' statutory and research & development delivery are not adversely affected 2. Environmental Considerations • Unit should have an ultra-low power consumption. • Unit should be designed for reuse/remanufacture and of regenerative nature to eliminate waste where possible. • Consideration of how packaging will be managed. Ideally at the time of installation the supplier will remove packaging and dispose of by ethical and environmentally friendly methods. Where possible packaging is to be re-used or recycled. • Consideration of life cycle assessment for the equipment. 3. Hardware, Software, PC, Licenses, operating systems The machine must have; • Dimensions of no more than 30 x 50 x 40 cm (W x D x H) and less than 30 kg • Direct connection to cloud-enabled system • Full-function touchscreen 4. Compatibility with existing hardware/software/equipment The machine proposed must be compatible with QuantStudio instruments / platform. 5. Installation Installation at the Cefas Weymouth site is required and must be undertaken by trained personnel. 6. Ease of maintenance Any user maintainable aspects of the system should be described in the bid submission, and must be specifically covered with the relevant Cefas staff during the installation. This is to include any limitations where there are no user serviceable aspects. 7. Parts, Consumables and Updates Cefas require any potentially required parts and consumables to be available for at least the next 5 years. 8. Warranties, Guarantees, Servicing Warranties will start from the point of acceptance of delivery. Cefas expect minimum warranty period of 24 months to be included in the purchase. The Supplier should also provide details of any extended warranty options, and servicing and maintenance options.

Dates and source

Runs 20 Sep 2024 to 20 Sep 2025
OCID ocds-b5fd17-ff1f67a2-a1c0-46d0-a0ad-1cbc5794a136
Notice Read it on Contracts Finder

Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.