GMCA 913 Carbon 4 Consultancy
Who
| Buyer | Greater Manchester Combined Authority — not a council we hold |
| Supplier | Perfect Circle JV Ltd |
What
To support the Carbon 4 Works (4 stations) The consultancy service requested will be, design consultancy services for RIBA Stages 2 - 7 • Building Surveyor - Design Services • Building Services Engineer - Design Services • Quantity Surveyor - Tender Documentation, Budget Estimates and Contract Administration / Valuation of Works Following appointment Perfect Circle (Gleeds (the owners of Perfect Circle)) will provide QS Services and will: • sublet the Building Services Design to Harley Haddow • sublet the Building Surveying and Principal Designer Services to David Trowler Associates. The nature of the work to be designed is: • Boiler Replacement by Air Source Heat Pump • Enhanced Building Control Systems • Provision of Solar Panels • Provision of Batteries • Limited Building Fabric Repairs.
Dates and source
| Runs | 1 May 2024 to 31 Oct 2025 |
| OCID | ocds-b5fd17-f8b86506-083d-4efa-8962-13c48e4aa63e |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.