Civic Signal GUEST
ROWS
API PATHS
Docs Sign in
Browsing as a guest. A free key raises the rate limit.

Skew Bridge, Grimsargh - Bridge Widening Works

Contracts Finder notice active GET /api/v1/contracts/94046
£1,079,112
value
GBP
23 Apr 2025
awarded
1
suppliers named

Who

Buyer Lancashire
Supplier AE Yates Limited

What

"Grimsargh Skew Bridge is a single span reinforced concrete structure which was previously strengthened in 2001. Currently, the width of the main bridge restricts traffic to a single lane width, restricting flow of vehicles. There are steel pedestrian footbridges on both sides (east & west) of the bridge. The eastern footbridge is relatively new and will be retained. A scheme has been developed to widen the structure to enable two-way traffic for vehicles and therefore improve traffic flows. The works substantially consist of the demolition of the western footbridge, the widening of the existing main bridge and the installation of a signalised pedestrian crossing to the north of the bridge, adjacent to the nearby primary school. The design of both the temporary and permanent works required for the bridge widening is proposed to be designed by the contractor to match the fixed highways alignment designed by LCC. The full scope of this project is contained at ITT Appendix 5 and the associated contractual documents. Please ensure that you read all documentation in the preparation of your Tender and should you have any queries on the contents, please raise a clarification request in the manner described at paragraph 2.7 within the timescales outlined with paragraph 3.1." Additional information: "The full tender pack including the ITT document outlining requirements, the specification and terms and conditions can be downloaded from the LCC isupplier portal. Returns must be submitted via the portal."

Dates and source

Runs 24 Feb 2025 to 30 Sep 2025
OCID ocds-b5fd17-e743d2b5-b949-49ff-bf52-3d7edc5174c9
Notice Read it on Contracts Finder

Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.