Civic Signal GUEST
ROWS
API PATHS
Docs Sign in
Browsing as a guest. A free key raises the rate limit.

Decision - King Alfred Leisure Centre

Brighton and Hove Council Decided 13 Oct 2025 approved GET /api/coverage
Decision maker
Council
Report author
—
Published
14 Oct 2025
Reference
7516

As published

the council's own words, unedited

This Council notes: 1) Residents are worried about the financial viability of the plans at a time when the council is struggling financially; 2) T he phase three consultation process in 2024 attracted only around 3600 responses [1] ; 3) The proposed facility is smaller than the existing one (e.g. 25m pool, modest 6-court hall), despite claims of a "world-class" centre [2] while costs have inflated from £47m (2024) to £65m (2025 RIBA 2); 4) The residential build is intrinsically related to the build of the leisure centre, and that they should be considered together; 5) There is no clear contingency for construction inflation, climate adaptation, or operator underperformance; 6) The King Alfred is already popular, and that popularity will be hard to increase given the small-scale nature of the upgrade; 7) The predictions of visitor numbers are highly speculative, and the cost will be much higher than the council is forecasting. This is potentially another i360. 8) The council is very unlikely to ensure that 40% of the housing stock is affordable. This Council resolves to: 1) Request that Cabinet reconsider: a) A pausing of the approval by cabinet of £2.3m in resources until the plans for housing have been set out; b) And a pausing of approval until the whole of the site is provisionally costed so taxpayers are not left counting the cost. [1] Engagement and consultation for King Alfred development [2] Exciting new plans unveiled for King Alfred Leisure Centre

Parsed from the document

gpt-5.6-luna-2026-07-09 · 1012/558 tokens · 6407ms · parsed 8 Sep 2026 11:40
Everything below was read out of a PDF by a model It is useful and it is not authoritative. The document it came from is linked in the rail, and where the two disagree the document is right.

The motion raises concerns about the financial viability, scale, costs and housing implications of the proposed King Alfred Leisure Centre redevelopment. It asks Cabinet to pause approval of £2.3 million in resources until the housing plans and provisional whole-site costs are set out.

Recommendation
Request that Cabinet reconsider pausing approval of £2.3 million in resources until the plans for housing have been set out, and pause approval until the whole site is provisionally costed.
Financial impact
£2.3 million in resources requested for approval; the proposed facility cost is stated as £65 million at 2025 RIBA 2, up from £47 million in 2024.
Ward affected
city-wide
Decision maker
Council
Date in document
13 Oct 2025

Stakeholders named

parsed
ResidentsTaxpayersBrighton & Hove City CouncilCabinet

Next steps

parsed
  • Cabinet is asked to reconsider pausing approval of £2.3 million in resources until the housing plans are set out.
  • The whole site is to be provisionally costed before approval proceeds.

Precedents

not built
"Decided elsewhere" is not built Finding the same decision in other councils needs semantic matching over decision text, which is part of the search rewrite. Until then, the council's own decisions list is the way through.
Documents
Who voted
Not extracted
Recorded votes are published in the minutes but we do not yet parse them into a direction per councillor. This page will not guess at one.
Watch this
Not built
Following a decision would ask you for a channel — email or webhook — at the point of following, with no default. Neither channel exists yet.
GET /api/coverage