Decision - A259: Walking, Cycling and Accessibility improvements

Brighton and Hove Environment, Transport & Sustainability Committee Decided 15 Mar 2022 approved GET /api/coverage
Decision maker
Environment, Transport & Sustainability Committee
Report author
James Hammond
Published
17 Mar 2022
Reference
6563

As published

the council's own words, unedited

Plans include: -Additional pedestrian space, including outside seating space. -Raised table junctions and dropped kerbs to assist wheelchairs, mobility scooters and pushchairs. -Extension of the westbound cycle lane with cyclists separated from motor vehicles. -Additional cycle parking spaces, including space for larger and adapted bikes. -Additional loading bays and parking spaces for Blue Badge holders.

1) That this Committee approve the A259 Active Travel Scheme - Walking, Cycling and Accessibility Improvement s detailed design scheme as presented in Appendix 1 . 2) That the Committee authorises officers to commence the construction phase and to procure the Works Contract under the authority of the Executive Director.

Parsed from the document

gpt-5.6-luna-2026-07-09 · 26052/2082 tokens · 13065ms · parsed 9 Sep 2026 11:45
Everything below was read out of a PDF by a model It is useful and it is not authoritative. The document it came from is linked in the rail, and where the two disagree the document is right.

The report presents feedback from a consultation on proposals to improve walking, cycling and disabled access along A259 Kingsway between Fourth Avenue and Wharf Road. The proposals include wider pavements, improved pedestrian and cycle crossings, cycle-lane extensions, more cycle parking, disabled parking, loading facilities and public space, with feedback from residents, businesses and stakeholder organisations informing design changes.

Recommendation
To take account of the consultation findings and stakeholder feedback in progressing the proposals to improve walking, cycling and accessibility on the A259, including the design changes identified in the report.
Financial impact
No budget amount stated; the report notes that funding has been identified using Section 106 money.
Ward affected
city-wide
Decision maker
Environment, Transport and Sustainability Committee
Date in document
1 Feb 2021

Stakeholders named

parsed
ResidentsLocal businessesPedestriansCyclistsPeople with disabilitiesCar driversBus usersEmergency servicesActive and Inclusive Travel ForumLocal community and residents’ associations

Next steps

parsed
  • Progress the A259 Kingsway proposals using the consultation findings and stakeholder feedback.
  • Incorporate agreed changes into the detailed design, including raised tables, additional crossings, tactile kerbs, improved signage and markings, loading facilities and disabled-bay design.
  • Continue monitoring bus times, traffic conditions and enforcement of cycle lanes.
  • Undertake further assessments during detailed design, including drainage assessment and consideration of wayfinding signage.
  • Consider longer-term aspirations such as two-way protected cycle lanes and wider junction improvements in future schemes.

Precedents

not built
"Decided elsewhere" is not built Finding the same decision in other councils needs semantic matching over decision text, which is part of the search rewrite. Until then, the council's own decisions list is the way through.
Documents
Who voted
Not extracted
Recorded votes are published in the minutes but we do not yet parse them into a direction per councillor. This page will not guess at one.
Watch this
Not built
Following a decision would ask you for a channel — email or webhook — at the point of following, with no default. Neither channel exists yet.
GET /api/coverage