the council's own words, uneditedThis report covers the outcomes of Further Consultation and Detailed Design of Phase 1 of the A23 Active Travel Scheme.
1) That the Committee approves the A23 Phase 1 Detailed Design as presented in appendix 1 and supports officers to procced with the associated Traffic Regulation Order. 2) That the Committee authorises officers to commence the construction phase and to procure the Works Contract under the authority of the Executive Director.
Parsed from the document
gpt-5.6-luna-2026-07-09 · 14423/4155 tokens · 24091ms · parsed 9 Sep 2026 11:45The report presents feedback from public drop-in workshops, emails and stakeholder engagement on the Phase 1 A23 Active Travel Scheme. Feedback covered cycling, walking, traffic capacity, parking, bus stops, accessibility, air quality, crossings and construction impacts, and was intended to inform further design revisions.
Stakeholders named
parsedNext steps
parsed- Use consultation feedback to inform design revisions where possible.
- Undertake further modelling and analysis of traffic capacity, bus stop arrangements, bus boarders and air quality impacts.
- Continue detailed design work, including accessibility, drainage, tree protection, parking, crossings, enforcement and construction management.
- Consult Preston Bowls Club in depth regarding changes near its entry point.
- Consider changes to bus stop arrangements and request any necessary change to S106 allocations.