TC005 Framework for Highways Work 2024-2028

Contracts Finder notice active GET /api/v1/contracts/120780
£40,000,000
value
GBP
6 Jan 2025
awarded
11
suppliers named

Who

Buyer Bolton
Supplier AE Yates Limited
Supplier Aggregates Industries UK Limited
Supplier Argyle North West Construction Limited
Supplier Bethell Group plc
Supplier Coating Services Ltd
Supplier George Cox & Sons Ltd
Supplier J Hopkins (Contractors) Ltd
Supplier Multipave NW Ltd
Supplier Rosgal Ltd
Supplier Tarmac Trading Ltd
Supplier The Casey Group Ltd

What

The Borough Council of Bolton ("the Client") is prepared to receive tenders for TC005 - Highways Construction Framework 2024 - 2028 which will be subject to the information, specification and tender package enclosed Lot 1- General Civil Engineering Works up to £2.0m, including • Minor Highway Improvements • Ducting Works • Drainage Works Undertake works included in the programme of Road Safety, junction improvement, Traffic Calming and other minor schemes. Undertake drainage works, including flood prevention works. Undertake civil and ducting works to existing and proposed traffic signal installations throughout Greater Manchester. Typical scheme value - £250,000 to £1,000,000. It is not possible to indicate how many, if any, schemes will be carried out each year. Lot 2 Patching, Re-Surfacing and Surface Treatment Works up to £2.0m Undertake Structural Maintenance programmes for classified and unclassified road carriageway and footway schemes. Typical scheme values have ranged between £30,000 and £600,000 with around £3M being spent each year. Lot 3 Highway New Works, Structural Maintenance and Associated Works up to £5.0m Undertake works included in the Principal Road Major Maintenance Programme. Undertake new highway works. Typical schemes have averaged £1,500,000 in value in recent years with around four schemes being carried out each year. Lot 4 Bridges and Highway Structures Improvement and Maintenance Works up to £3.0m Undertake bridgeworks and highway structures works programme. Average scheme value is £125,000 with 2 or 3 schemes being carried out each year.

Dates and source

Runs 1 Feb 2025 to 31 Jan 2029
OCID ocds-b5fd17-ee35d6d2-b830-4578-85f9-e6a85ed61518
Notice Read it on Contracts Finder

Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.