Highway Works Multiple Lots Framework - HDG/2023/461
Who
| Buyer | Stoke-on-Trent |
| Supplier | Bealine Groundworks Ltd |
| Supplier | Bridge Construction Ltd |
| Supplier | Cashelton Construction Ltd |
| Supplier | Connor Construction (South West) Ltd |
| Supplier | Fitzgerald Contractors Ltd |
| Supplier | Glyn Walley Groundworks Limited |
| Supplier | GN Groundworks Limited |
| Supplier | Haystoun Construction Ltd |
| Supplier | H & G Ash |
| Supplier | keble heath construction ltd |
| Supplier | KIELY BROS LTD |
| Supplier | Kilkern |
| Supplier | Multevo Ltd |
| Supplier | NMS Civil Engineering Ltd |
| Supplier | Roy Beech (Contractors) Ltd |
| Supplier | Springett Surfacing |
| Supplier | The Casey Group Ltd |
| Supplier | WJ Roadmarkings Ltd |
What
The City Council's Highways Operations Division is responsible for maintenance of the adopted highway network in Stoke-on-Trent. The creation of this framework will provide increased capacity to enable the team to meet in-coming demand. During any periods where demand is greater than capacity, additional resources will be drawn down through the framework. This framework will be divided into Lots and will cover the following activities: \r • Carriageway patching and pot-hole works\r • Small to medium scale resurfacing works\r • Minor Road Repairs - Labour day rated\r • Car park constructions\r • Drainage infrastructure repairs and installations \r • Vehicle access crossing points\r • Paving and footway works \r • Specialist paving works \r • Civil Engineering Projects\r
Dates and source
| Runs | 2 Jan 2024 to 2 Jan 2028 |
| OCID | ocds-b5fd17-2139dbbb-6b37-48ce-97c0-40f7fa0788ca |
| Notice | Read it on Contracts Finder |
Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.