BE24115 - HNTAS Pilot Assessors

Contracts Finder notice active GET /api/v1/contracts/66547
£165,000
value
GBP
30 Aug 2024
awarded
4
suppliers named

Who

Buyer DESNZ — not a council we hold
Supplier Aecom
Supplier Buro Happold Limited
Supplier Elevate Everywhere Ltd
Supplier WSP UK Limited

What

**Please note this is an award notice, not a competition. This contract has been awarded via the Crown Commercial Services - RM6314 - Demand Management & Renewables Framework - Lot 4.1: Heat Networks - Heat Network Design ** The Department for Energy Security and Net Zero has a requirement to appoint organisations that have specialist heat network practitioners who are able to assess the technical performance of heat networks participating in the Heat Network Technical Assurance Scheme (HNTAS) pilot programme The Energy Act 2023 provides for Ofgem to be appointed as regulator of the heat networks sector and grants Ofgem the power to authorise individuals to operate heat networks and undertake supply activity. Ofgem will grant authorisation to a heat network operator, provided that the operator's network meets certain authorisation conditions. The Energy Act provides for compliance with minimum technical standards to be included as one of these conditions. This lays the foundation for technical standards secondary legislation which is expected to come into force in 2025 to introduce mandated minimum technical standards for heat networks (e.g. mandating requirements on water flow temperatures, pipe insulation, etc). All heat networks (existing and new) across a range of different characteristics (large city sized district heating to single block communal networks) will be in scope of this requirement. Heat networks are comprised of several elements (e.g. energy centre, district distribution network, communal distribution network, thermal substation, consumer connection and consumer heat system). Heat networks and elements also have several stages within their lifespans (e.g. feasibility, design, construction, and operation and maintenance). The draft Code documents set minimum technical standards for each of these elements and stages. In order for a heat network to be assured as having met the technical requirements, heat network operators will need to have their networks assessed for different elements at different stages. Once a network passes these assessments the network can apply for a certificate to demonstrate overall compliance

Dates and source

Runs 2 Sep 2024 to 31 Jul 2025
OCID ocds-b5fd17-c17910f4-dfaf-4837-889c-c14cc9d5c786
Notice Read it on Contracts Finder

Figures are as published An award value in OCDS may be a framework ceiling rather than a sum anyone expects to spend, so a large figure here is not evidence of a large purchase.